ADVANTEC served as the prime consultant to LA Metro on the SR-60/7th Avenue Interchange Improvements Project—an “Early Action Project” developed in collaboration with Caltrans District 7. ADVANTEC was responsible for managing the project from the Preliminary Assessment/Environmental Document (PA/ED) phase, including NEPA and CEQA compliance and technical studies, through the preparation of Plans, Specifications, and Estimates (PS&E), and ultimately construction support and closeout. This $15 million project focused on improving horizontal and vertical ramp geometrics, mitigating traffic impacts, and enhancing operational efficiency within a constrained urban environment characterized by tight right-of-way and heavy traffic volumes. The design accommodated existing land use and was coordinated with potential future widening of the SR-60 mainline, while incorporating ADA-compliant pedestrian features.
SR-60 7th Ave Interchange Improvements PA/ED
Los Angeles County Metropolitan Transportation Authority
-
Horizontal and vertical ramp geometric improvements
Project management across PA/ED and PS&E phases
NEPA and CEQA technical study preparation and support
Traffic impact analysis and project report
Design within constrained right-of-way and dense land use
Heavy traffic conditions and regional freeway coordination
ADA-compliant pedestrian ramp integration
Coordination with future SR-60 mainline widening plans