REPRESENTATIVE PROJECTS

ADVANTEC has a 25-year history of successful projects with strong partnerships which continue to develop as the Southern California region continues to innovate and improve.

Featured Projects

Public Works Advantec USA Public Works Advantec USA

Valley Blvd. at San Gabriel Blvd. Intersection Improvement

As a result of the “No Build” determination on the I-710 Gap Closure, LA METRO retained ADVANTEC on an On-call Highway Engineering Services Contract to mitigate subsequent traffic impacts along Valley Boulevard in the Cities of San Gabriel and Alhambra. Project involves identifying Year 2045 operational improvements to the New Avenue, Del Mar Avenue and San Gabriel Boulevard intersections along Valley Boulevard.

Read More
Civil Engineering, Caltrans Projects Advantec USA Civil Engineering, Caltrans Projects Advantec USA

SR 57/60 Confluence Project

Among the Los Angeles County Metropolitan Transportation Authority’s (LA Metro) current projects is the 57/60 Confluence Project is a three-phase program of improvements consisting of ramp and interchange reconfigurations as well as the addition of auxiliary collector/distributor and bypass lanes to significantly reduce the weaving and the resulting congestion and accidents.

Read More
Caltrans Projects Advantec USA Caltrans Projects Advantec USA

I-105 Express Lanes Segments 1, 2 and 3

This project consists of the preparation of Plan, Specifications and Estimates (PS&E) for the addition of two high occupancy toll (HOT) Express Lanes on I-105 on an accelerated schedule between I-405 and Central (Segment 1), and also Segments 2 to 3. The project includes approximately 15 miles of widening within the existing right-of-way, involving bridge widenings, new retaining and sound walls, and new toll collection infrastructure, including tie-in to the existing I-110 Express Lanes. ADVANTEC responsibilities included the PS&E of all electrical, ITS and tolling infrastructure - highway lighting, Caltrans TMS (ramp metering, fiber optic backbone, traffic signals, CCTV, CMS, traffic monitoring stations), and tolling (fiber optic backbone, CCTV, detection stations, toll zone gantries, VMS). Project also included coordination and implementation of ITS elements as part of Metro’s Integrated Corridor Management (ICM) Project associated with the new Clipper’s arena.

Read More

Purple Line (D Line) Subway Extension Project, Since 2010

County of Los Angeles – Purple Line Subway Extension Project

Being the biggest public works project in the West Coast, at a budget of $9 billion, the Metro Purple Line (D Line) Extension Transit Project is a critical link in the Los Angeles County (LA) transit network serving the westside cities with seven new stations and over 9 miles of tunnels. This will provide a safe, reliable, and affordable high-speed connection between downtown Los Angeles and one of LA’s busiest areas, the Westside, which are the two largest job centers in LA. transportation. This is also one of the “28 for 28” high-profile projects funded by METRO and the Federal government for the 2028 Los Angeles Olympics.

Read More
Civil Engineering, Highway Engineering Advantec USA Civil Engineering, Highway Engineering Advantec USA

SR-60/7th Ave Interchange Improvements

ADVANTEC is the prime consultant to LA METRO on this “Early Action Project" for Caltrans District 7. ADVANTEC is responsible for the project from the Preliminary Assessment/Environmental Document (PA/ED) phase; including NEPA and CEQA support (technical studies) and approval, through the Plans, Specification and Estimate (PS&E) phase and finally Construction Support and close out.

Read More